LebAlert
Updated: Route 12A Full Bridge Closure
The Route 12A Dry Bridge will be closed starting Thursday, March 6, 2025 at 9:00am, due to safety concerns following a Bridge Load Rating Analysis. Initially, only the sidewalk was expected to close, but after further evaluation, the entire bridge will now be closed until further notice. Temporary shoring will need to be completed to maintain stability until full replacement. A detour will be in place for vehicles, but pedestrian and bicycle access will be allowed unless active construction is underway. Drivers should plan for changes to their daily routes and additional travel time. Learn more at LebanonNH.gov/DryBridge.
